Scheduling rules for dynamic shops that manufacture multi-level jobs KM Mohanasundaram, K Natarajan, G Viswanathkumar, ... Computers & Industrial Engineering 44 (1), 119-131, 2003 | 91 | 2003 |
Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain KP Li, VK Ganesan, AI Sivakumar* International journal of production research 43 (13), 2671-2685, 2005 | 90 | 2005 |
Scheduling of single stage assembly with air transportation in a consumer electronic supply chain K Li, VK Ganesan, AI Sivakumar Computers & Industrial Engineering 51 (2), 264-278, 2006 | 68 | 2006 |
Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain K Li, AI Sivakumar, VK Ganesan European Journal of Operational Research 187 (2), 442-455, 2008 | 56 | 2008 |
A branch and bound algorithm to minimize completion time variance on a single processor G Viswanathkumar, G Srinivasan Computers & Operations Research 30 (8), 1135-1150, 2003 | 55 | 2003 |
Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation K Li, AI Sivakumar, VK Ganesan International Journal of Production Economics 115 (2), 482-491, 2008 | 42 | 2008 |
Hierarchical minimization of completion time variance and makespan in jobshops VK Ganesan, AI Sivakumar, G Srinivasan Computers & Operations Research 33 (5), 1345-1367, 2006 | 30 | 2006 |
Solution methodology for synchronizing assembly manufacturing and air transportation of consumer electronics supply chain K Li, AI Sivakumar, M Mathirajan, VK Ganesan Available at SSRN 588024, 2004 | 23 | 2004 |
Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times VK Ganesan, AI Sivakumar International journal of production economics 103 (2), 633-647, 2006 | 18 | 2006 |
Methodologies for synchronised scheduling of assembly and air transportation in a consumer electronics supply chain K Li, VK Ganesan, AI Sivakumar, M Mathirajan International Journal of Logistics Systems and Management 2 (1), 52-67, 2006 | 18 | 2006 |
Order acceptance and scheduling: overview and complexity results VP Palakiti, U Mohan, VK Ganesan International Journal of Operational Research 34 (3), 369-386, 2019 | 13 | 2019 |
System and Method for Budget-Compliant, Fair and Efficient Manpower Management S SenGupta, S Salsingikar, S Bose, V Ganesan US Patent App. 13/395,982, 2013 | 11 | 2013 |
Order acceptance and scheduling in a parallel machine environment with weighted completion time VP Palakiti, U Mohan, VK Ganesan European Journal of Industrial Engineering 12 (4), 535-557, 2018 | 8 | 2018 |
Solving Large Scale Vehicle Routing Problems with Hard Time Windows under Travel Time Uncertainty K Haripriya, VK Ganesan IFAC-PapersOnLine 55 (10), 233-238, 2022 | 7 | 2022 |
Adaptive inventory replenishment for dynamic supply chains with uncertain market demand VK Ganesan, D Sundararaj, AP Srinivas Industry 4.0 and Advanced Manufacturing: Proceedings of I-4AM 2019, 325-335, 2021 | 7 | 2021 |
Enhancing operational efficiency of a container operator: A simulation optimization approach S Sinha, VK Ganesan Proceedings of the 2011 Winter Simulation Conference (WSC), 1722-1733, 2011 | 7 | 2011 |
Look ahead batching to minimize earliness/tardiness measures in batch processes AK Gupta, SA Iyer, VK Ganesan IEEE Conference on Robotics, Automation and Mechatronics, 2004. 2, 1101-1106, 2004 | 7 | 2004 |
Hot lot management: Minimizing cycle time in batch processes AK Gupta, VK Ganesan, AI Sivakumar 2004 IEEE International Engineering Management Conference (IEEE Cat. No …, 2004 | 7 | 2004 |
Method and system for adaptive inventory replenishment VK Ganesan, AP Srinivas US Patent US11475531B2, 2022 | 5 | 2022 |
Scenario-based stochastic shelter location-allocation problem with vulnerabilities for disaster relief network design S Hansuwa, U Mohan, VK Ganesan European Journal of Industrial Engineering 16 (5), 507-530, 2022 | 5 | 2022 |