Drivers, constraints and the future of offsite manufacture in Australia N Blismas, R Wakefield Construction innovation 9 (1), 72-83, 2009 | 521 | 2009 |
Public and private blockchain in construction business process and information integration R Yang, R Wakefield, S Lyu, S Jayasuriya, F Han, X Yi, X Yang, ... Automation in construction 118, 103276, 2020 | 492 | 2020 |
Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction M Arashpour, R Wakefield, EWM Lee, R Chan, MR Hosseini International Journal of Project Management 34 (7), 1393-1402, 2016 | 141 | 2016 |
Off-site construction optimization: Sequencing multiple job classes with time constraints M Arashpour, R Wakefield, B Abbasi, EWM Lee, J Minas Automation in construction 71, 262-270, 2016 | 132 | 2016 |
Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction M Arashpour, V Kamat, Y Bai, R Wakefield, B Abbasi Automation in Construction 95, 1-9, 2018 | 129 | 2018 |
Optimization of process integration and multi-skilled resource utilization in off-site construction M Arashpour, R Wakefield, N Blismas, J Minas Automation in Construction 50, 72-80, 2015 | 128 | 2015 |
Design and development of distributed solar PV systems: Do the current tools work? WMPU Wijeratne, RJ Yang, E Too, R Wakefield Sustainable cities and society 45, 553-578, 2019 | 124 | 2019 |
The development and testing of a hierarchical measure of project OHS performance H Lingard, R Wakefield, P Cashin Engineering, Construction and Architectural Management 18 (1), 30-49, 2011 | 121 | 2011 |
Towards a new development model for housing regeneration in greyfield precincts P Newton, S Murray, R Wakefield, C Murphy, LA Khor, T Morgan Australian Housing and Urban Research Institute, 2011 | 102 | 2011 |
Analysis of seismic failure in skew RC bridge RR Wakefield, AS Nazmy, DP Billington Journal of Structural Engineering 117 (3), 972-986, 1991 | 96 | 1991 |
Concrete prefabricated housing via advances in systems technologies: Development of a technology roadmap N Blismas, R Wakefield, B Hauser Engineering, Construction and Architectural Management 17 (1), 99-110, 2010 | 94 | 2010 |
Petri nets for simulation and modeling of construction systems RR Wakefield, GA Sears Journal of construction engineering and management 123 (2), 105-112, 1997 | 92 | 1997 |
Factors influencing food choice by the seaweed-eating marine snail Norrisianorrisi (Trochidae) RL Wakefield, SN Murray Marine Biology 130, 631-642, 1998 | 90 | 1998 |
Autonomous production tracking for augmenting output in off-site construction M Arashpour, R Wakefield, N Blismas, T Maqsood Automation in construction 53, 13-21, 2015 | 87 | 2015 |
Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources M Arashpour, R Wakefield, B Abbasi, M Arashpour, R Hosseini Architectural Engineering and Design Management 14 (1-2), 46-59, 2018 | 86 | 2018 |
Analysis of disruptions caused by construction field rework on productivity in residential projects M Arashpour, R Wakefield, N Blismas, EWM Lee Journal of construction engineering and management 140 (2), 04013053, 2014 | 81 | 2014 |
Industrializing the Residental Construction Site M O'Brien, R Wakefield, Y Béliveau | 74 | 2000 |
Exploring the link between early constructor involvement in project decision-making and the efficacy of health and safety risk control H Lingard, P Pirzadeh, N Blismas, R Wakefield, B Kleiner Construction management and economics 32 (9), 918-931, 2014 | 70 | 2014 |
The effect of early supplier engagement on social sustainability outcomes in project-based supply chains LW Saunders, BM Kleiner, AP McCoy, H Lingard, T Mills, N Blismas, ... Journal of Purchasing and Supply Management 21 (4), 285-295, 2015 | 66 | 2015 |
The relationship between pre-construction decision-making and the effectiveness of risk control: Testing the time-safety influence curve H Lingard, L Saunders, P Pirzadeh, N Blismas, B Kleiner, R Wakefield Engineering, Construction and Architectural Management 22 (1), 108-124, 2015 | 54 | 2015 |